Strong Letha bed: MORN takes 20-30 days to produce a lathe bed (material selection, welding, high-temperature annealing to remove stress, precision testing, etc.). These procedures can prevent weld cracks and lathe bed stress deformation, so as to increase the load capacity, cutting precision and stability.