Strong Letha bed: MORN takes 20-30 days to produce a lathe bed (material selection, welding, high-temperature annealing to remove stress, precision testing, etc.). These procedures can prevent weld cracks and lathe bed stress deformation, so as to increase the load capacity, cutting precision and stability.

Related Videos

Related Products

Related Samples